How long will solar panel installation take? – One of the most common main questions every homeowner asks a solar installer when planning for installation. s stumble upon when thinking about solar installation is, ‘how long will solar panel installation take?’ However, there is no fixed answer to this question, as the installation process comprises several steps, including. These steps include approaching contacting the solar panel installation company, getting permit approvals, installing and inspecting the solar panels in Qld, etc. All these processes do not take place overnight and might take months to complete. 

 

To get a better understanding of the duration, take a look at the points mentioned below:

  1. Choosing a solar installation company

The time taken to choose a solar installation company might range from 1 day to 2 weeks. However, don’t pick the first company you come across. Instead, do thorough research first. It is better to know how energy is generated from the solar on the Fraser Coast. Only a reliable solar company can provide you with this information. Ensure that the company is experienced enough, as their experience will help them provide you with a high-quality installation. Checking their reviews will help you get a better idea about the quality and timeline.

  1. Site assessment

During the process of site assessment, a solar installer will visit your home to check if your roof is suitable for carrying out the installation process. The process of site assessment will not take more than a day. To be on the safer side, consider the total duration as one week.

  1. System design

Once the assessment is done, the engineer will start developing the design of the solar system. This design will be based on the roof characteristics, local building code requirements, electricity usage, and so on. The process of system design might take approximately 2 to 3 weeks.

  1. Applying for various permits

Before starting the installation process, you should need to have all the necessary permits. This step takes the longest time to achieve, and the duration might range from 2 to 7 weeks. These permits can include, the building permit, electrical permits, etc. The permits might also differ from location to location. Therefore, in some cases, the permits might be approved within 2 weeks., However, in some cases, they might take more than 2 months. Many solar power installers also take the responsibility of handling such paperwork. Thus, you don’t need to worry about these procedures.

  1. Ordering various equipment and planning the installation

If your installer already has the equipment ready, the installation process can start quickly. However, the installers can also take extra weeks to ship the equipment to the desired location, thus which then lengthenings the duration.

  1. Installation 

The actual installation process requires a minimum amount of time. This duration can last up to 6 hours. However, the time completely depends on the design of the system. The more complex the system design, the more time it will take to install.

  1. City inspection

You can’t start using solar power immediately after as soon as the installation is done. You will be required to get a few stamps of approval before using solar power. A local inspector will check if the panels have been installed correctly. This is done to ensure proper and safe installation for solar in Howard.

  1. Utility interconnection and permission to operate

You also need to take permission from the utility company. The time taken for the utility company to approve may range from 2 to 6 weeks. They will also install a new electrical meter. Upon completing all the necessary stampings and formalities are done, you can use solar power.

Therefore, the total duration might range from 2 months to 6 months. However, the above-mentioned rules might vary based on several factors, such as your locality. Therefore, to solve all your doubts, contact a reliable solar installer in Hervey Bay.